The whole job, in order
One team from the first skip to the last box.
Most building work is three trades pretending to be one. We register for all three so the plot below only ever has one contractor on it — and the programme has no gaps between them.
-
Stage 01
Demolition & strip-out
SIC 43110 · Demolition
We take down what is in the way — a tired outbuilding, a rear wall, a whole house — separate the waste, and leave a clean, level plot with the services capped and marked.
- Soft strip and internal demolition
- Structural demolition with temporary works
- Site clearance and documented waste removal
-
Stage 02
Construction of domestic buildings
SIC 41202 · Construction of domestic buildings
New-build houses, rear and side extensions, loft conversions and full refurbishments. Footings, brickwork, roof, first and second fix — built to the drawings, to Building Regulations, and to the programme we agreed at the start.
- Groundworks, structure and roof
- Extensions, lofts and structural openings
- First fix, second fix and finishes
-
Stage 03
Removal services
SIC 49420 · Removal services
When the house is ready, we move you in — packed, carried and placed by the people who know where every socket is. The same team moves tenants or furniture out before the strip-out starts.
- Move-out before works, move-in after
- Packing materials, careful handling
- Storage arranged while the work runs